THE GATEWELL PROTOCOL  · the open standard for origin evidence · v1.0 comment draft  Read it →
Gatewell Group
Los Angeles · Regulatory Advisory

The gate to the American market did not close. It moved.

Gatewell Group takes allied-country manufacturers of FCC Covered-List equipment through Conditional Approval and onto American shelves: filing strategy, US manufacturing plans, and the entity infrastructure, all under one engagement.

63
Conditional Approval grantees on the register
10
Router grantees whose approval ends in 2027
12
Weeks from listing to first grants, the precedent
0
PRC applicants approved to date
The Situation

We work both doors that remain.

Since the Commission's July 28 order, foreign-produced power inverters and advanced robotic devices join drones and routers on the Covered List, where new equipment authorizations are barred and nothing ships without one.

One route is Conditional Approval, a national-security review of ownership, supply chain, and a credible US manufacturing plan. The other is domestic manufacture above the Buy American content floor. Only grants are ever published. A denial goes unannounced and still follows the applicant. The first filing is the one that matters.

We act for manufacturers from Korea, Taiwan, Japan, and Europe, for the US subsidiaries that carry their compliance file here, and for the American importers, distributors, integrators, and developers who buy from them.

Practice
i.

Market Access & Conditional Approval

Exposure diagnostics, single-model and product-family filings, agency correspondence through grant, and equipment authorization beyond it.

Filings from $95,000
ii.

Onshoring & Domestic Content

Manufacturing plans that survive scrutiny: site and EMS selection, incentives, content engineering to the 65 and 75 percent floors, CBP rulings.

Plans from $65,000
iii.

US Entity & Standing Compliance

Responsible-party and agent-for-service coverage, annual attestation against the rising floor, vendor-bench diligence for the American side of the trade.

From $4,000 / yr
Full schedule of services
Why Gatewell

We file the cases we would bet on.

Every engagement begins with a diagnostic and ends in a written risk-factor assessment, our read on paper of where your case stands against every grant pattern ever published. We decline structures we judge un-approvable before they become someone’s visible mistake.

Washington firms write excellent filings at $1,400 an hour and hand you a binder. Certification houses shepherd lab tests but have never built a factory plan. Gatewell carries the filing, the manufacturing plan, the US responsible party, and the annual attestation under one letter, because the agencies now expect all four from the same applicant.

Fees are fixed and staged against milestones, on a conventional deposit structure, with wire-ready terms and a gross-up where treaties fall short. You will always know the number before we begin.

Begin with the diagnostic.

The diagnostic takes two weeks at a fixed fee, half credited if we proceed together. It gives you your covered status, your pathway, and our written judgment on whether we would file your case.

Request a Diagnostic
Or start with the free Playbook →